Anjung Kecil Oil Field

Posting Date: 09/Sep/2020

 Malaysia
Oil field development

Anjung Kecil oil field development The Anjung Kecil oil field development includes Anjung Kecil well-head platform and Marginal Marine Production Unit (MaMPU)-1 floating production storage and offloading (FPSO) vessel. 



Vestigo procured a low pressure-condensate recovery system (LP-CRS) unit for the field in September 2016.  The company performed a geophysical survey at the oil field using research and seismic support vessel Java Insignia in March 2019.  The Anjung Kecil well-head drilling operation commenced using tender-assisted drilling rig Mist in June 2019. The rig reached the oil field from Singapore’s Keppel Feels Pier. The vessels involved in the drilling work were 246ft-long Mist, 70m-long Grade One Manjung 8, and 75.27m-long Ena Samurai.  A 1.26km-long dynamic subsea power cable will be laid between the FPSO and the well-head platform as part of the field modification plan.


Project Information

Offshore Sarawak, Malaysia

Other Information

Investors: Petronas Carigali
Operators: Vestigo Petroleum
Operators: MISC Berhad / Acteon’s /MR Innovative Offshore Solutions / NGLTech / MTC Group